LONDONENERGY LTD · Awarded contract
Awarded

Turbine Hall Fire Detection and Suppression System

Awarded 11 Dec 2026

View live tenders
Awarded11 Dec 2026
Value£285,897.40
RegionLondon
CategoryEnergy & Environment
Expires in 1y 1mo1y term, 4% elapsed
Awarded 11 Dec 2026Expires 11 Dec 2027

The contractor shall provide a complete engineered fire detection and suppression system, including all labour, materials, plant, access equipment, design services, testing equipment, certification and documentation necessary to deliver a fully operational system.

The protected scope comprises four individual turbine areas within the Turbine Hall.

For tendering purposes, each turbine shall be assumed to have an approximate protected area of 15 m², giving an indicative total protected turbine area of approximately 60 m².

Tenderers shall verify all dimensions, access constraints, hazard locations and coverage requirements during the site survey and shall base the final design on confirmed site measurements and risk assessment.

• Site surveys and risk assessment of the Turbine Hall and protected turbine assets.

• Design of the fire detection, alarm interface and suppression system.

• Selection and supply of detectors, control panels, suppression equipment, pipework, nozzles, cylinders, pumps, valves, cabling, containment, signage and ancillary equipment.

• Installation of all system components, including interfaces with existing fire alarm, plant control, shutdown, ventilation or building management systems where required.

• Factory acceptance testing, site acceptance testing, commissioning and functional performance testing.

• Provision of certification, operation and maintenance manuals, as-built drawings, cause-and-effect documentation and training.

• Provision of warranty, defects support and proposals for ongoing inspection, testing and maintenance.

4.

Regulatory and Standards Compliance The system and all works shall comply with all applicable UK legislation, regulations, approved guidance and recognised standards current at the date of tender and installation.

The contractor shall identify and declare all applicable standards within their tender submission and shall state any proposed deviations.

• Regulatory Reform (Fire Safety) Order 2005 and the duties of the Responsible Person.

• BS 5839-1 for fire detection and fire alarm systems in non-domestic premises, including design, installation, commissioning and maintenance requirements.

• Applicable BS EN 54 standards for fire detection and alarm components.

• Applicable standards for the selected suppression technology, which may include BS EN 15004 for gaseous extinguishing systems, BS 8489 for industrial and commercial watermist systems, BS EN 12845 for sprinkler systems, or other relevant recognised standards appropriate to the proposed solution.

• Where water mist is proposed, the system shall comply with BS 8489 or another applicable recognised standard for industrial and commercial water mist systems, together with manufacturer approvals, fire test evidence and any insurer requirements relevant to turbine or machinery-space oil-fire protection.

• BS 7273 requirements for interfaces between fire detection systems and ancillary fire protection measures, where applicable.

• Health and Safety at Work etc.

Act 1974, CDM Regulations 2015, Electricity at Work Regulations 1989 and all applicable site safety requirements.

• Manufacturer installation instructions, insurer requirements and industry best practice.

5.

Technical Requirements 5.1 Fire Risk Basis The principal fire risk within the protected turbine areas arises from steam pipework operating at conditions and temperatures above the flash point of the oil used within the turbine systems.

Oil pipework and steam pipework run adjacent to one another, increasing the likelihood that an oil leak, spray, mist or release could come into contact with hot steam pipework or other high-temperature surfaces and ignite.

The fire detection and suppression design shall therefore be based on credible oil-release scenarios, including pressurised leakage, dripping, pooling, spray impingement, atomised mist and contact with hot pipework or adjacent hot surfaces.

Tenderers shall explain how their proposed solution detects and suppresses fires originating from these scenarios at an early stage and how the design reduces the risk of fire escalation to adjacent turbine equipment, cable routes, insulation, lagging and structural elements.

5.2 Fire Detection • The detection system shall provide reliable early warning appropriate to the turbine risk profile and environmental conditions within the Turbine Hall, with particular consideration of oil leakage onto high-temperature steam pipework and associated hot-surface ignition scenarios.

• The preferred detection technology is infrared flame detection.

Tenderers shall propose IR flame detectors, or an equivalent or superior flame detection solution, and shall justify the suitability of the proposed technology for the turbine environment.

• The detection system shall be capable of reliable operation in dark conditions and in areas containing numerous hot surfaces, including turbine casings, pipework, lagging, exhaust surfaces and other high-temperature equipment.

• The system shall be capable of detecting fires fuelled by different substances and materials reasonably foreseeable within the Turbine Hall environment, including but not limited to hydrocarbon fuels, lubricating oils, electrical equipment, insulation materials, plastics, cable materials and other combustible or flammable materials associated with turbine operation and maintenance.

• The design shall address potential false alarm sources, including hot surfaces, reflected radiation, welding or maintenance activities, sunlight or artificial light, airflow, temperature variation, dust, vibration, access constraints and maintenance requirements.

• The system shall include appropriate zoning, device identification, alarm indication and integration with the existing fire alarm infrastructure.

• The tenderer shall provide a proposed cause-and-effect matrix showing alarms, alerts, shutdowns, suppression release logic, delays, interlocks, manual release and abort functions where applicable.

5.3 Fire Suppression The suppression design shall provide suitable protection for all four turbine areas.

Tenderers shall state whether their proposed suppression approach is based on individual turbine local application, grouped zone protection, total flooding or another engineered arrangement, and shall justify how the design achieves effective coverage for each approximate 15 m² turbine area.

• The suppression system shall be suitable for the turbine fire risks, including oil leakage or spray onto steam pipework operating above the oil flash point, electrical, mechanical and hot-surface ignition scenarios where relevant.

• Any water mist design shall be suitable for oil leakage, spray or pool-fire scenarios involving ignition on or near high-temperature steam pipework and other hot surfaces, and shall demonstrate effective suppression or control without relying on excessive water application.

• The preferred suppression technology is a water mist system, selected to minimise water usage, reduce collateral damage and improve suppression effectiveness for credible oil-fire scenarios within the turbine areas.

Tenderers shall propose a water mist solution, or an equivalent or superior suppression technology, and shall justify the selected suppression medium and method, including design basis, discharge performance, droplet characteristics, protected volume or local application approach, compatibility with turbine equipment and impact on personnel safety.

• The solution shall minimise collateral damage, avoid unacceptable operational impact and be suitable for the environmental conditions of the Turbine Hall.

• The system shall include all required detection-release controls, manual release points, lock-off or isolation arrangements, warning devices, signage, monitoring, status indication and fault reporting.

• The contractor shall identify any requirements for ventilation shutdown, plant trip, fuel or oil isolation, electrical isolation, dampers, access control, evacuation warnings or post-discharge recovery.

5.4 Integration and Interfaces The contractor shall identify all required interfaces with existing site systems and shall include the design, testing and commissioning of those interfaces within their tender price unless explicitly excluded.

Interfaces may include the existing fire alarm system, turbine controls, emergency shutdown systems, ventilation controls, building management systems, security systems, local alarms and remote monitoring arrangements.

6.

Contractor Competence and Quality Requirements • Tenderers shall demonstrate proven experience in designing and installing fire detection and suppression systems in industrial, power generation, energy-from-waste, turbine, machinery space or comparable high-value asset environments.

• Tenderers shall provide evidence of relevant third-party certification, competent-person arrangements, manufacturer accreditation and quality management systems.

• All works shall be undertaken by trained and competent personnel using approved materials and methods.

• The contractor shall provide project-specific risk assessments, method statements, lifting plans, access plans, isolation requirements and commissioning procedures before commencing work.

Similar open tenders12

Servicing, Maintenance and Reactive Repair of Sprinklers, Gas Suppression, Dry Risers and Fire Hydrants – East Renfrewshire Council (2027–2029)Public Safety & Security
23 Nov 2026
Fire Alarm Maintenance Services – University of Sheffield Campus and AMRC SitesPublic Safety & Security
08 Jan 2027
Fire Alarm Design, Installation and Project Management Services – Scottish Government DPSPublic Safety & Security
27 Jun 2031
BLD0323-02 03 Fire Strategies Phase 2 & 3Consultancy & Legal
05 Jan 2028
Ceiling Void Fire Protection Survey and Scope of Works for Multiple DepotsPublic Safety & Security
27 Nov 2026
Maintenance and Repair of Fire Alarm and Associated Systems – Northumbria HealthcarePublic Safety & Security
27 Nov 2026
Servicing and Maintenance of Fire Safety Systems for Central Bedfordshire Council HousingPublic Safety & Security
13 Dec 2026
Provision of Fire Stopping, Fire Doors and Associated ServicesPublic Safety & Security
30 Nov 2026
60-Month Dynamic Purchasing System for Fire Prevention Works — Sprinkler, Fire Alarm and FRA-Based Services (UK)Public Safety & Security
31 May 2029
Active Fire Safety Systems Inspection, Maintenance and Remedial Works – bpha Residential PortfolioPublic Safety & Security
12 Jan 2027
Supply of Electric-Drive Natural Gas Centrifugal Compressor Packages – Qualification SystemManufacturing & Industrial
30 Oct 2035
Fire Engineering and Inspection Services for London and Quadrant Self‑Delivered New Build Projects – Dynamic Purchasing SystemConsultancy & Legal
28 Mar 2032

Other similar contracts12

Purchase of a fire alarm system for Lower House Farm Waste Transfer StationPublic Safety & SecurityBLAZEQUEL LTD
$92,188
Design of Fire Detection and Suppression Systems for ISIS Neutron and Muon FacilityPublic Safety & SecurityInternational Fire Consultants Limited
$100,000
Fire Servicing TenderPublic Safety & SecurityOpen View Security Solutions Ltd
$105,998
Award of Call-Off Contract for Fire Suppression Systems and Associated Fire Safety Works via Fusion21 DPSPublic Safety & SecurityENGIE Regeneration Limited,Mulalley and Company Limited,United Living (South) Limited,Harmony Fire Ltd,Domestic Sprinklers,Harmony Fire Ltd
$6,411,078
CA17827 - Invitation to Tender - The provision of planned preventative maintenance of fire alarm, fire detectors, intruder alarm, kitchen suppression and CCTV servicing, to include system monitoring, reactive and planned works.Public Safety & SecuritySCOPE FIRE AND SECURITY LTD
$249,174
Design, Installation, and Maintenance of Gas Suppression System for Server Room by Isle of Wight CouncilPublic Safety & SecuritySecure I.T. Environments Ltd
$50,000
Statutory Compliance and Planned Preventative Maintenance Services on Fire Safety EquipmentPublic Safety & SecurityWalker Fire UK Ltd
$4,000,000
Fire Safety Study and Feasibility for Retrofitting Fire Suppression Systems in Thanet High Rise BuildingsConsultancy & LegalCapital Property and Construction Consultants Ltd
$80,676
Design, Supply, and Installation of Inert Gas Fire Suppression System for University of East Anglia Data Centres 1 & 2Public Safety & SecurityBRYLAND FIRE PROTECTION LTD
$371,632.48
Depot Fire Hydrants Design and Build - Tranche 1InfrastructureDELCORE FIRE ENGINEERING LTD
$804,541
Retrofitting of Fire Suppressant Sprinkler Systems in Seven High-Rise Housing Blocks for Stevenage Borough CouncilConstructionMULALLEY & CO. LIMITED
$2,100,000
Management of Design, Supply, Installation & Maintenance of Fire Suppression Systems for Dudley MBCPublic Safety & SecurityTyco Fire & Integrated Solutions Limited
$2,069,568

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.