Moveable Shielding Concept Design Study
UK FUSION ENERGY LTD · Awarded contract
AwardedMoveable Shielding Concept Design Study
Awarded 28 Oct 2026
Awarded from this tender, closed 17 Sept 2026Concept Design Study for Moveable Shielding – STEP Prototype Power Plant, West Burton
View the tender →Awarded28 Oct 2026
Value£84,000.00
SupplierOve Arup & Partners Ltd
AgencyUK FUSION ENERGY LTD
RegionSouth East
CategoryEnergy & Environment
Expires in 3mo4mo term, 21% elapsed
Awarded 28 Oct 2026Expires 25 Feb 2027
About
UKFE has appointed a supplier to provide a Concept Design Study for a Moveable Shielding requirement, as part of the STEP Prototype Power Plant.
UKFE is leading the delivery of the STEP programme to design and build the UK’s first prototype fusion energy plant at West Burton, Nottinghamshire.
UKFE ran a below threshold Open competition via FTS and the UKFE Delta portal, which has led to a supplier being appointed.
Similar open tenders12
TenderCloses
Procurement of STEP Engineering System Partners for UK Prototype Fusion Energy Plant (5 Lots)Energy & Environment
29 Jan 2027
Shield Door Design, Supply & Installation – Rutherford Appleton Laboratory, Harwell CampusConstruction
08 Dec 2026
Whole Energy Absorption Spectrometer System for Fusion Materials Research – UKAEA MRF Phase IResearch & Development
14 Dec 2026
Design and Supply of Modular Adiabatic Compressed Air Energy Storage (A-CAES) Demonstrator Plant – Westlakes Science ParkEnergy & Environment
09 Dec 2026
Scaled-down FALCON Valve Prototype Design and Build for STEP Prototype PowerplantResearch & Development
04 Dec 2026
Relocation of 10 Transformers at UK Atomic Energy Authority Culham Campus, AbingdonInfrastructure
17 Dec 2026
UK National Nuclear Laboratory DPS for Operations, Site Work and Facilities Management (8 Lots)Construction
08 Jan 2029
Outline Designs for Neville Hill 195 Fleet Heavy Maintenance – Northern Trains LtdTransport & Logistics
23 Nov 2026
UK Government Grants for New or Expanded Energetic Materials and Munitions FactoriesManufacturing & Industrial
08 Jan 2027
Deep Geothermal Development Partner for Countess of Chester HospitalEnergy & Environment
09 Dec 2026
Replacement of Standby Power Generators and Fuel Infrastructure — MHRA Laboratories, South MimmsEnergy & Environment
02 Dec 2026
UK Ministry of Defence Nuclear Deterrence Fund – Research Proposals (FY24–27, £3.3m Pilot)Defense & Aerospace
30 Mar 2027
Other similar contracts12
Contract and supplierAwarded value
HVAC concept-level studyEnergy & EnvironmentAlpha Developments (UK) Limited, trading as Alpha Engineering
$84,000
Electrical Engineering Design Support for STEP Power Infrastructure Concept DesignEnergy & EnvironmentFraser Nash Consultancy
$203,500
Study on Mechanically Decoupled First Wall for STEP ProgrammeResearch & DevelopmentFrazer-Nash Consultancy Ltd
$21,750
Electrical Engineering Support for STEP Power Infrastructure Concept DesignEnergy & EnvironmentFraser Nash Consultancy
$504,110
Award of Fusion Power Plant Divertor Heat Exchanger Design Challenge to Multiple SuppliersResearch & DevelopmentNorton Straw,Rolls Royce Power Engineering,Wood Nuclear Limited,Frazer-Nash Consultancy Ltd
$170,602.03
Design Study for UK Accelerator-Driven Fusion-Neutron Irradiation FacilityResearch & DevelopmentPhoenix LLC
$99,850
Electrical Engineering Support for STEP Power Infrastructure Concept DesignConsultancy & LegalFrazer Nash Consultancy Limited
$176,490.71
STEP Construction PartnerEnergy & EnvironmentILIOS
$10,000,000,000
Process Engineering Support for STEP Power Infrastructure Concept DesignEnergy & EnvironmentAtkins Ltd
$513,725
Process Engineering Support for STEP Power Infrastructure Concept DesignResearch & DevelopmentAtkinsRéalis UK Limited
$171,264.41
Heavy Lifting and Integrated Plant Solution for STEP Fusion ReactorResearch & DevelopmentAtkins Limited
$558,543
Process Engineering Support for STEP Power Infrastructure Concept DesignEnergy & EnvironmentAtkins Ltd
$227,748
Suppliers similar to Ove Arup & Partners Ltd8
SupplierContracts
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month
Revenue from government work£312K won so far