Tender: Scaled-down FALCON Valve Prototype Design and Build for STEP Prototype Powerplant
Released 13 days ago
About
Project team is seeking a supplier for the detailed design and manufacture of a scaled-down Fast Acting Low Conductance (FALCON) valve prototype to safeguard the STEP Prototype Powerplant exhaust vacuum pumping technology against disruption mitigation or sudden massive air ingress events. The work covers the detailed design and build of the scaled prototype including everything within the Vacuum Gate/Isolation valve casing (including the casing itself), with primary focus on the actuation mechanism and the seals needed to maintain isolation valve operation and the vacuum integrity of the process gas line; the valve must reach its defined close position within 37.5 ms.
Similar open tenders9
Similar awarded contracts12
Likely value £35K to £150KAgency spend history
United Kingdom Fusion Energy LtdContract size
What United Kingdom Fusion Energy Ltd has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





