Installation of Electric Heater Batteries in CAPE Building Laboratories at University of Leeds
Awarded 01 Jun 2021
About
University of Leeds awarded a contract to BCS Electrics Ltd for the installation of four electric heater batteries within ductwork supplying four laboratory areas in the CAPE Building, along with associated electrical infrastructure.
The project included building works such as lowering ceilings for power cable installation, installing a new doorway into an existing electrical riser, and firestopping where cables penetrate fire walls.
It also involved installing a new BMS controller to operate the heater batteries and mechanical work to break into and modify existing ductwork for mounting the heater batteries.
The contract value was £90,000.