Guildford Borough Council · Awarded contract
Awarded

GBC - Weyside Urban Village - Phase 1 and 3 Infrastructure

Awarded 01 Mar 2027

View live tenders
Awarded01 Mar 2027
Value£12,479,884.06
RegionSouth East
CategoryInfrastructure
Expires in 1y 3mo1y term, 4% elapsed
Awarded 1 Mar 2027Expires 29 Feb 2028

The Works The works for this project involve the infrastructure works relating to the Weyside Urban Village Phases 1 and 3 development plots.

In summary, the Works under this Contract will comprise: • Necessary surveys, and investigations and monitoring.

• Demolition of remaining buildings (including the existing Guildford Council Depot) • Vegetation clearance, tree felling and site strip • Topsoil stripping • Sitewide remediation of contamination (where required) • Site platform and levelling • Drainage infrastructure, pipework, manholes, attenuation tanking, petrol interceptors • Swales and attenuation basins • Surface water outfalls • Utility infrastructure, ducting, chambers, pipework • Highway formations • Signage, markings, street furniture, street lighting • Non-motorised Vehicles works, encompassing various pedestrian and cycle path improvements • S278 Junction Works • Maintain the reptile translocation fencing and associated inspections Location Location of Project: • Area named Phase 1: Weyside Urban Village (Slyfield regeneration Programme), Land to the south of Bellfield Allotments, Guildford, GU1 1QG.

• Area named Phase 3: Weyside Urban Village (Slyfield regeneration Programme), existing Guildford Borough Council’s Depot site, Guildford GU1 1QE.

• Area named NMU: Farm Close, Section 106 ref 6, Mangles Road Section 106 ref 10.4 and Towpath improvements section 106 ref 8-9 Works by Others During these works there are likely to be the following works being undertaken by the Employer and statutory undertakers on and or around the site, including but not limited to; • Ground water monitoring.

• Other works may be occurring adjacent to the site on the wider master site plan.

• Ecological watching brief by an independent ecologist • Archaeological watching brief by an independent archaeologist • Utilities works / diversions (which do not form part of the Scope of these works).

• General s278 Highways works • Works associated with the relocation of the Sewerage Treatment Works • Off site demolitions

Similar open tenders12

Other similar contracts12

GBC - Weyside Urban Village - Phase 1 and 3 InfrastructureInfrastructureNatta Building Company Ltd
$12,479,884.06
Ground Investigation for Weyside Urban Village Infrastructure by Guildford Borough CouncilInfrastructureGeo-Environmental Services
$153,297
Demolition of Agricultural Club and Depot Ancillary Buildings at Weyside Urban Village, GuildfordConstructionR Collard Ltd
$95,639
Landscaping and Footpath Works at Wichelstowe Gateway Phase 1Constructionidverde Limited
$128,184.54
Operation Watershed - King George V Playing FieldWater & SanitationLANDBUILD LIMITED
$88,736.83
Drainage CCTV Survey and Jetting for High Wycombe Town Centre Masterplan Phase 4InfrastructureEurovia Contracting
$3,486.18
Site Clearance and Earthworks Contract for Northstowe Phase 2 WestConstructionC R MacDonald Limited
$3,482,512
Site Assessment and Masterplanning for Toutley Depot and Adjacent Field in WokinghamConsultancy & LegalGVA Grimley Ltd
$215,000
Demolition and Enabling Works at Twyford Site, Queenborough and RushendenConstructionHughes and Salvidge Limited
$182,374
Power Infrastructure Upgrade for Defra Weybridge Site via Dual 132/11kV SubstationsEnergy & EnvironmentUK Power Networks Services (Commercial) Limited
$40,911,986.65
Gaurdbridge Primary School Extension and Refurbishment – WP003 Site Works, Groundworks, Brick, Block, Precast, Drainage and Landscaping PackageConstructionRG Construction
$241,071.83
Site Access, Infrastructure & Groundworks at Hereford Enterprise Zone Plots C1 & C1aInfrastructureWalsh Construction Ltd
$728,184.81

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.