Tender: Kensington Palace Boiler Room Upgrade - Replacement with High-Efficiency Condensing Boilers
Released 2 days ago
About
A supplier is sought to carry out a boiler room upgrade at Kensington Palace. The project replaces end-of-life atmospheric gas boilers with high-efficiency condensing boilers and includes installation of new hot water cylinders, plate heat exchangers, associated pipework, valves and ancillaries. Works cover removal and disposal of existing plant; survey, replacement or relining of existing boiler flues; assessment and necessary upgrades to the gas supply including replacement of obsolete mechanical gas drop safety valves with electrically operated solenoid valves; replacement of electrical installations needed to serve the new plant; cleaning, flushing and dosing of the heating system; replacement of thermostatic radiator valves and lockshield valves; associated builders' work, making good and redecoration of the plant room; and testing, commissioning and handover with all relevant certification and operation and maintenance manuals. The new system must be designed to enable future connection to a heat network being investigated through a joint RHPS/HRP feasibility study and to provide significantly improved energy efficiency while maintaining reliable heating and hot water services.
Similar open tenders11
Similar awarded contracts12
Likely value £140K to £270KAgency spend history
The Royal HouseholdContract size
What The Royal Household has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





