Scheme Design for BEPO Reactor Core Decommissioning Plant, Equipment, and Machinery

Awarded 24 Feb 2022

View live tenders
Awarded24 Feb 2022
Value£996,315.00
RegionUnited Kingdom
CategoryConsultancy & Legal
Ended 3y 9mo ago12mo term
Awarded 24 Feb 2022Expired 20 Feb 2023

CTM Portal for the NDA Shared Services Alliance awarded a contract to James Fisher Nuclear for the production of scheme designs for plant, property, and equipment (PP&E) used to decommission the BEPO reactor core.

The contract, valued at AUD 996,315, was awarded via the Business and Technical Services Marketplace Dynamic Purchasing System (OJEU contract notice TED reference 2019-S 228-559692).

The scope covers design of PP&E to support the existing decommissioning process, ensuring functionality meets the Decommissioning Safety Case requirements for safe decommissioning of the reactor core.

The design must align with the Decommissioning Programme (Ref BOSS/SC/001/13 Issue 4), Decommissioning Safety Case (Ref BEP0/DSC/17/0001 Issue 2), and Level 3 Radiological Risk and ALARP Assessment (Ref BEP0/DSC/17/0001/07 Issue 1).

The end point is for 6m3 ILW concrete boxes to be filled, grouted, lidded, and placed onto transport for egress from the decommissioning site.

Similar open tenders12

Other similar contracts12

Scheme Design for Direct Export of Irradiated Fuel to R82 Flasks at DounreayEnergy & EnvironmentNuclear Decommissioning Limited
$1,900,000
Civil Engineering Support for Decommissioning Scheme Design OversightConsultancy & LegalWestlakes Engineering Limited
$104,543
Engineering Design Management for Decommissioning ProgrammeConsultancy & LegalAECOM
$176,176
Scheme Design for D2001 Miscellaneous Irradiated Fuels Disposition Project at DounreayEnergy & EnvironmentCavendish Nuclear Limited
$2,900,000
Demolition of B927 and Internal Redundant Equipment (Phase A MEWP & HP&S Works) via DDP FrameworkConstructionCumbria Nuclear Solutions Limited
$10,430.63
Demolition Concept Design Study for Dungeness A Nuclear Power Station DecommissioningEnergy & EnvironmentCyclife UK Ltd
$450,663
Demolition of B60.1 - Phase 1 (Optioneering Proposal) via DDP FrameworkConstructionCumbria Nuclear Solutions Limited
$32,373
Decommissioning Equipment Clearance at Calder Site via DDP FrameworkEnergy & EnvironmentIntegrated Decommissioning Solutions
$907,150.93
Engineering Support Services for Legacy Ponds Plant Maintenance at FGMSP and PFSPConsultancy & LegalThe Decommissioning Alliance II
$4,226,262.37
Award of FRFRP Decommissioning Plan Development to Jacobs Clean Energy LimitedEnergy & EnvironmentJacobs Clean Energy Limited
$4,218,086
Award of DAR 2 Conceptual Design for Reactor Dismantling at Trawsfynydd SiteEnergy & EnvironmentCavendish,Jacobs,Atkins
$1,596,287
Assessment of Magnox Pond Decommissioning ExperienceConsultancy & LegalVenture Engineering Projects
$95,140.29

Unlock the full platform.

7 days free, then £36/GBP per month. Cancel anytime.

What you get

Find

Find consultancy and legal tenders in United Kingdom in one place.

We monitor central, devolved and local government portals in near real time and update the feed as tenders are published, so you check one place instead of many.

Search by keyword, or describe your workType a keyword, or switch to AI search and say what your business does.
Narrow it downFilter by category, region and area, or view open tenders on a map.

Alerts

Open tenders like this contract, sent to you.

Tell us what you are looking for and we email you when a matching tender is published.

Set it up your wayUse keywords, a description of your work, a location or a distance from a postcode. Up to 10 alerts.
Instant or dailyGet an email when a match is published, or one summary a day.

Assess

Size up a tender in minutes.

Before you open a single document, get the requirements, a likely value and who you would be up against.

Requirements from the documentsWho can bid, mandatory criteria, how it is scored, insurance and key dates, each with its source.
Value and competitionAn estimated value from similar awarded contracts, and the suppliers most likely to bid.

Market

Follow James Fisher Nuclear and get alerts when they win again.

Awarded contracts with the supplier and the value, so you can check prices, spot competitors and find work that is coming back to tender.

Supplier and buyer profilesWhat each one has won or awarded, who they work with, and how that is changing.
Contracts ending soonTerms that finish in the next 12 months, which often go back out to tender.

Pipeline

Track your bids from interested to won.

Save a tender in one click and move it through each stage as you work on it.

Work as a teamInvite colleagues so you work from the same list.
Take it with youExport tenders and matches to CSV.

GovBot

Ask a question in plain English.

Find tenders, look up a supplier, or check who won a contract. Just type what you need.

Get started

Get consultancy and legal tenders in United Kingdom by email.

Find the tender, size it up and track the bid, in one place.

7 days free, then £36/GBP per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.