RIBA Stage 3 Design Development for Callander Active Travel Bridge
Stirling Council · Awarded contract
AwardedRIBA Stage 3 Design Development for Callander Active Travel Bridge
Awarded Unknown
AwardedNot specified
Value£49,000.00
SupplierJacobs
AgencyStirling Council
RegionScotland
CategoryInfrastructure
About
Stirling Council awarded a contract to Jacobs for the completion of RIBA Stage 3 design development for the new active travel bridge in Callander.
The work included progressing the concept design from Stage 2, understanding ground conditions, initiating the planning application process, and providing a more accurate understanding of costs and risk before detailed design.
The contract value was £49,000.
Similar open tenders12
TenderCloses
Design Team Services for North Lochs Community Hall Redevelopment, LeurbostConstruction
18 Dec 2026
Bagillt to Greenfield Active Travel Route ConstructionInfrastructure
09 Dec 2026
Design and Contract Administration for Three Playgrounds in Hounslow (Beaversfield, Bear Road, Crane Park)Construction
26 Nov 2026
Design of Public Realm to RIBA Stage 3 for Camden High Street PedestrianisationInfrastructure
27 Nov 2026
Design and Build 34m Replacement Footbridge over South Tyne River – Dryburn (near Garrigill, Alston Parish)Infrastructure
07 Jan 2027
Lead Designer & Multidisciplinary Team for Carrick-a-Rede Visitor Infrastructure Capital Works – National Trust NIInfrastructure
02 Dec 2026
Design and Construction of Strabane Leisure Centre and Road Realignment — Preliminary Market EngagementConstruction
27 Nov 2026
Architect-led Early-Stage Design for Mixed-Use Housing at Pierhead Street, ButetownConstruction
10 Dec 2026
Active Travel Infrastructure Construction — Ashgrove Connects Initial WorksInfrastructure
14 Dec 2026
2026 Structural Replacement and Repair Works to Bridges – Citizen (£240,000, 6-month contract)Infrastructure
11 Dec 2026
Lead Architect-Led Design Team for Raise the Roof – RIBA Stages 5–7 at Wolverhampton Arts CentreConstruction
27 Nov 2026
Stage 1 Contractor Appointment for Ionad Eilean nan Òige Community Hub (Phase 3 Design Finalisation)Construction
21 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Concept Design and Technical Assurance for Callander Bridge by JacobsInfrastructureJacobs
$30,000
Award of Active Travel Feasibility and Concept Design Package for North East StirlingConsultancy & LegalJacobs U.K. Limited
$233,094.66
Technical Design Services for Levelling Up Fund Active Travel ProgrammeConsultancy & LegalJacobs
$85,672.98
RIBA Stage 3 Developed Design for Accessible Pedestrian and Cyclist Bridge over Erewash CanalInfrastructureGagarin Studio Ltd
$50,000
Consultancy Services for Prestwick to Barassie Active Travel Route (RIBA Stages 3 and 4)Consultancy & LegalAECOM Limited
$700,000
Active Travel Infrastructure Survey and Route Design Consultancy for Argyll and Bute CouncilConsultancy & LegalJacobs
$234,960
Design of Active Travel Corridor from Kilmarnock to Lugton (RIBA Stages 0-2)InfrastructureSweco UK Limited
$165,190
Design of Banff-Macduff Active Travel Bridge by ArcadisInfrastructureArcadis
$199,700
Drybridge Active Travel Link, Irvine - RIBA Stage 3 & 4 Design DevelopmentInfrastructureProject Centre Limited
$81,544.2
Award of Kirkintilloch Gateway Active Travel Consultancy to Stantec UK LimitedConsultancy & LegalStantec UK Limited
$67,523.12
Structural and Transport Design Update for Jubilee Gardens (RIBA Stage 4)Consultancy & LegalCampbellReith
$27,885
Design Standards Advice and Professional Services Framework Awarded to Jacobs UK LtdConsultancy & LegalJacobs Uk Ltd
$69,268
Suppliers similar to Jacobs8
SupplierContracts
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month
Revenue from government work£312K won so far





