Reservoir Discontinuance and Demolition Works at University of St Andrews
Awarded Unknown
About
The University of St Andrews awarded a contract to Thomas Menzies (Builders) Ltd for reservoir discontinuance works, including breaching the reservoir embankment, infilling the upstream settlement tank, and demolishing the pipe bridge.
The scope covered excavation of dam embankment material, installation of breached slope surface protection, re-grading of the upstream face, removal and reinstatement of fencing, infilling of overflow and bottom outlet structures, removal and disposal of the pipe bridge, cutting and capping remaining pipes, infilling the settlement tank with granular compacted fill, installation of a new DN150 HDPE seepage collection pipe and a mass concrete cut-off wall, and removal and disposal of the GMS walkway, flow control penstock, and valve brickhouse.
The contract value was GBP 305,482.57.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





