Replacement of Steel Bailey Bridge at RSPB Forsinard Flows
RSPB Scotland · Awarded contract
AwardedReplacement of Steel Bailey Bridge at RSPB Forsinard Flows
Awarded Unknown
AwardedNot specified
Value£0.00
SupplierHenry Beaver
AgencyRSPB Scotland
RegionScotland
CategoryInfrastructure
About
RSPB Scotland awarded a contract to Henry Beaver for the removal and disposal of a steel bailey bridge and the design and installation of a new bridge at RSPB Forsinard Flows.
Similar open tenders12
TenderCloses
Design and Build 34m Replacement Footbridge over South Tyne River – Dryburn (near Garrigill, Alston Parish)Infrastructure
07 Jan 2027
Design and Contract Administration for Three Playgrounds in Hounslow (Beaversfield, Bear Road, Crane Park)Construction
26 Nov 2026
RSPB Cymru Peatland Restoration – Berwyn SSSI (south of Llangollen) 2026–2027Energy & Environment
30 Nov 2026
Peatland Restoration Works — Forsinard Flows: Clach Geala Forest to BogEnergy & Environment
25 Nov 2026
RSPB Design of Erosion Protection and Vegetation Restoration for Inland Loch IslandsEnergy & Environment
01 Dec 2026
Blackdown Hills Green Finance Accelerator – River Wolf Weir Modifications, Floodplain Reconnection Designs and High‑Risk Water Quality Outfalls (South West England)Energy & Environment
30 Nov 2026
Train Wood Greenspace Infrastructure Works – Design, Flood Risk Permit Support, Resurfacing, Footbridge, Pond and Platform Installations (Norwich)Infrastructure
06 Jan 2027
2026 Structural Replacement and Repair Works to Bridges – Citizen (£240,000, 6-month contract)Infrastructure
11 Dec 2026
DfI River Directorate Framework for Watercourse Maintenance – Riverbank, Flood Defence & Aquatic Weed ControlInfrastructure
10 Dec 2026
Predator Control Services for RSPB NI — Fox and Crow Reduction at Knocks & Corranny, County FermanaghEnergy & Environment
24 Nov 2026
Floodplain Reconnection, Weir Modification and High-Risk Water Quality Outfall Outline Designs — Blackdown Hills Green Finance AcceleratorEnergy & Environment
30 Nov 2026
Peatland Restoration Works – Ty’n y Maes Raised Bog, Nant Ffrancon (Gwynedd)Energy & Environment
30 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month
Revenue from government work£312K won so far





