Replacement of Full Retention Separator at Oban South Pier
Awarded Unknown
About
Caledonian Maritime Assets Ltd (Utility) awarded a contract to Alchemy Plant & Contracting Ltd for the replacement of a full retention separator at Oban South Pier.
The project involved removing the existing interceptor and two access manholes, installing a new full retention separator compliant with current regulations, and reusing or reworking some existing pipework.
It included constructing a new manhole upstream of the separator for future isolation during maintenance, a new access manhole over the separator, and two access chambers.
Duck-billed and flap valves were installed downstream to prevent seawater backflow into the separator.
The contract value was GBP 109,810.