Removal of Bronie Burn Weir and Channel Restoration by McGowan Environmental Engineering
Scottish Environment Protection Agency · Awarded contract
AwardedRemoval of Bronie Burn Weir and Channel Restoration by McGowan Environmental Engineering
Awarded Unknown
AwardedNot specified
Value£0.00
RegionScotland
CategoryWater & Sanitation
About
The Scottish Environment Protection Agency awarded a contract to McGowan Environmental Engineering Ltd for the removal of a weir on the Bronie Burn, including associated bank protection, low-level embankments, realignment and regrading of the channel, and installation of bar apex large wood structures.
Similar open tenders12
TenderCloses
Blackdown Hills Green Finance Accelerator – River Wolf Weir Modifications, Floodplain Reconnection Designs and High‑Risk Water Quality Outfalls (South West England)Energy & Environment
30 Nov 2026
Floodplain Reconnection, Weir Modification and High-Risk Water Quality Outfall Outline Designs — Blackdown Hills Green Finance AcceleratorEnergy & Environment
30 Nov 2026
Design and Construction of Horse Fen & Somerton South Pumping Stations and Somerton Culvert – Upper Thurne Package 3Water & Sanitation
19 Jan 2027
RSPB Cymru Peatland Restoration – Berwyn SSSI (south of Llangollen) 2026–2027Energy & Environment
30 Nov 2026
Design and Build 34m Replacement Footbridge over South Tyne River – Dryburn (near Garrigill, Alston Parish)Infrastructure
07 Jan 2027
Peatland Restoration Works at Aberhirnant (Foel Cedig & Groes Fagl) – Eryri (Snowdonia)Energy & Environment
16 Dec 2026
DfI River Directorate Framework for Watercourse Maintenance – Riverbank, Flood Defence & Aquatic Weed ControlInfrastructure
10 Dec 2026
Conversion of King George V Pontardawe Tennis Courts to Meadow, SuDS, Tree Planting and Natural PlayEnergy & Environment
27 Nov 2026
Natural Flood Management Works – Leaky Dams & Overland Flow Management, WatlingtonEnergy & Environment
23 Nov 2026
Peatland Restoration Works – Ty’n y Maes Raised Bog, Nant Ffrancon (Gwynedd)Energy & Environment
30 Nov 2026
ScotGate Retaining Wall Repair – Gabion Wall Construction and Stone Buttress ReinstatementInfrastructure
07 Dec 2026
Scrub Removal for Peatland Restoration at Selshion ASSI (approx. 20 ha) – PEAT+ FundedEnergy & Environment
26 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Options Appraisal for Restoring Migratory Fish Access on Bronie BurnEnergy & Environmentcbec eco-engineering UK
$0
Feasibility and Concept Design for Dargavel Burn Restoration and Weir RemovalConsultancy & LegalFairhurst
$0
Technical Design and Groundworks Supervision for Removal of Halter Burn WeirInfrastructureHaskoningDHV UK Ltd
$99,992
Removal of Abbeydale Weir from River Arrow, RedditchWater & SanitationWMP Contracting Ltd
$17,393
Brerachan Water Restoration Project Awarded to McGowan Environmental EngineeringWater & SanitationMcGowan Environmental Engineering Ltd
$71,988
Removal of Gateside Mills Weir in FifeWater & SanitationEbsford Environmental Ltd
$166,350
Topographic Surveys and Concept Design for Weir Removal at Halter BurnWater & SanitationRoyal HaskoningDHV
$0
River Restoration and Bridge Replacement on Burdiehouse BurnWater & SanitationMclaren Plant Ltd.
$0
Outline Design for Weir Removal/Enhancement to Improve Fish PassageEnergy & EnvironmentJBA Consulting
$99,339.61
Islip Bund Recovery and Weir Control DecommissioningInfrastructureBreheny Civil Engineering Ltd
$96,706
Remeandering of Dundonald Burn for Biodiversity and Flood ManagementEnergy & EnvironmentMAM Contracting Limited
$0
Assessment and Project Development for Removal of Keybridge Weir on De Lank RiverEnergy & EnvironmentFishtek Consulting
$11,238
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open water and sanitation tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month
Revenue from government work£312K won so far