West Lothian Council · Awarded contract
Awarded

Refurbishment of Almond Valley Bridge Southbound on A899 in West Lothian

Awarded Unknown

View live tenders
AwardedNot specified
Value£1,127,721.00
RegionScotland
CategoryInfrastructure

West Lothian Council awarded a contract to Diack & Macaulay Ltd for the refurbishment of the Almond Valley Bridge Southbound, located at the southern end of the A899 within the West Lothian area.

The contract value is GBP 1,127,721.

Similar open tenders12

Refurbishment Works of Menai Bridge Public Convenience and Library Exterior; Amlwch Public Convenience RefurbishmentConstruction
03 Dec 2026
Design and Build 34m Replacement Footbridge over South Tyne River – Dryburn (near Garrigill, Alston Parish)Infrastructure
07 Jan 2027
2026 Structural Replacement and Repair Works to Bridges – Citizen (£240,000, 6-month contract)Infrastructure
11 Dec 2026
Swanswell Viaduct Strengthening and Trestle Repair – Coventry Ring RoadInfrastructure
18 Dec 2026
Construction, Maintenance and Minor Works Framework – Causeway Coast and Glens Borough CouncilConstruction
11 Dec 2026
A38 Segregated Cycle Route Construction – Selly Oak to Longbridge (4.95 km)Infrastructure
18 Dec 2026
Design and Construction of Four‑Bay Steel Workshop at Sidley Depot, Bexhill-on-SeaConstruction
07 Dec 2026
Technology and Highway Lighting Surveys for Lower Thames Crossing Roads North (A13, M25, A1089)Infrastructure
23 Nov 2026
Roof Repairs and Minor Works Contract – Clyde Valley Group (Lanarkshire, Glasgow, East Dunbartonshire)Construction
11 Dec 2026
Framework Agreement for Drainage Civil Engineering Works – East Dunbartonshire CouncilWater & Sanitation
11 Dec 2026
Blackdown Hills Green Finance Accelerator – River Wolf Weir Modifications, Floodplain Reconnection Designs and High‑Risk Water Quality Outfalls (South West England)Energy & Environment
30 Nov 2026
South West Wales Regional Civil Engineering Contractors Framework 2027 – Appointment of Contractors for Civil and Specialist Civils Works across Carmarthenshire, Ceredigion, Neath Port Talbot, Pembrokeshire and SwanseaInfrastructure
26 Nov 2026

Other similar contracts12

Replacement of Almond Valley Joint Bridge on A899 Dual CarriagewayInfrastructureDiack & Macaulay Ltd
$369,109.4
Refurbishment of Guildiehaugh Bridge in Bathgate, West LothianInfrastructureAmalgamated Construction Ltd
$366,966
Refurbishment of Cousland Interchange Bridge at A899/A706 JunctionInfrastructureChemcem Scotland Limited
$371,983
Refurbishment of Victoria Bridge, Kilmarnock (A735 20)InfrastructureDiack & Macaulay Ltd
$725,221.25
Refurbishment of Durris Bridge (A957) by Diack & Macaulay Ltd for Aberdeenshire CouncilInfrastructureDiack & Macaulay Ltd
$355,269
Refurbishment of Langholm Suspension Bridge by Diack & Macaulay LtdInfrastructureDiack & Macaulay Ltd
$296,351.8
Refurbishment of Condorrat Overbridge by Diack & Macaulay LtdInfrastructureDiack & Macaulay Ltd
$150,460
Establishment of Framework Agreement for RiverLife: Almond and Avon - Almond Barriers ProjectInfrastructureAmalgamated Construction Ltd,Cubby Construction Ltd,Ebsford Environmental Ltd,George Leslie Ltd,Mackenzie Construction Ltd,Noel Regan & Sons Building & Civil Eng Contractors UK Ltd,r j mcleod (contractors) ltd
$1,200,000
Refurbishment of Craigellachie Bridge by Amalgamated Construction LtdInfrastructureAmalgamated Construction Ltd
$982,821.58
Safety Barrier Replacement at Various Bridge Locations on A8011 CumbernauldInfrastructureDiack & Macaulay Ltd
$120,091.6
A70 Glenbuck Realignment and Bridge Replacement by R J McLeodInfrastructureR J McLeod
$2,059,130
Replacement of Access Bridges at 14 Common Blocks for Almond Housing AssociationConstructionDBM Building Contractors Ltd
$0

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.