Installation of Closed-Circuit Chilled Water Cooling System at Purdie Building, University of St Andrews
University of St Andrews · Awarded contract
AwardedInstallation of Closed-Circuit Chilled Water Cooling System at Purdie Building, University of St Andrews
Awarded Unknown
AwardedNot specified
Value£277,981.68
SupplierTaylor and Fraser
AgencyUniversity of St Andrews
RegionScotland
CategoryConstruction
About
The University of St Andrews awarded a contract to Taylor and Fraser for the installation of a closed-circuit chilled water system in the Purdie Building (School of Chemistry) to eliminate cold water consumption by laboratory instruments.
The project involved introducing wall-mounted cooling interface units in Rooms 118, 234, 325, 417, and 425, modifying existing cold water supplies for pressurisation, and integrating solenoid valve activation with a new BMS to prevent stagnation.
The contract value was GBP 277,981.68.
Similar open tenders12
TenderCloses
Dearne Community Fire Station Air-Cooled Chiller Replacement – S63 5DNConstruction
09 Dec 2026
Replacement of Office Chiller Plant and Associated M&E Works – Bristol & Bath Science Park, Emersons GreenConstruction
04 Dec 2026
Water Hygiene Monitoring, Servicing and Reactive Maintenance – University of Dundee (Dundee City Properties)Water & Sanitation
30 Nov 2026
Supply and Support of Cryogen-Free Dilution Refrigerator System and ConsumablesResearch & Development
21 Dec 2026
Portesbery School – Supply and Installation of Air Conditioning Units for Classrooms and Post-16 BuildingConstruction
25 Nov 2026
Supply and Installation of Air Conditioning Units – Portesbery School (Current Site & New Post-16 Building)Construction
25 Nov 2026
Design and Manufacture of Refrigerant-Based Amplifier Head Cooling System – Central Laser FacilityManufacturing & Industrial
17 Dec 2026
Construction and Building Services for St Malachys College, Belfast (C001444EEY)Construction
24 Nov 2026
QEHB Heat Recovery Project — 2.5MW Heat Recovery Chillers, 0.5MW Geothermal Wells and New Energy CentreEnergy & Environment
07 Dec 2026
Temperature Monitoring System and Services for UKHSA Cambridge Laboratory (2027–2031)Health & Medical
15 Dec 2026
Sir Roger Manwood's School Sixth Form Grange Air Source Heat Pump InstallationEnergy & Environment
13 Dec 2026
Electronic Access Control Installation for Security and Self-Closing Doors – York St John University London Campus (Clove Crescent E14)Public Safety & Security
23 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Design, Supply, and Installation of Primary Chilled Water System for Building 30 at University of SouthamptonConstructionCool-Therm UK Ltd
$527,742
Installation of Chilled Drinking Water Points at 49/51 Gordon Square HousesConstructionArtic Building Services
$54,000
Supply and Installation of Closed Circuit Cooling Tower for University of SheffieldConstructionHALLAMSHIRE HEATING & AIR-CONDITIONING COMPANY LIMITED
$121,100
Remedial Works for Primary Chilled Water System at Mountbatten Building, University of SouthamptonConstructionCooltherm (UK) Ltd.
$841,838.15
Installation of Hydraulic Pumps and Chilled Water System Extension at University of SouthamptonConstructionD.S.R. MECHANICAL SERVICES LIMITED
$127,818
Supply and Installation of Hydraulic Press with Closed-Loop Chiller for University of EdinburghManufacturing & IndustrialIntelicare Limited
$147,124
Replacement of Roof-Mounted Chiller Plant at Cockcroft Science Building, University of SalfordConstructionTHE JAMES MERCER GROUP LIMITED
$378,392.45
Supply, Installation and Commissioning of Two Chilled Water Systems at STFC Rutherford Appleton LaboratoryManufacturing & IndustrialSouthern Maintenance Solutions UK Limited
$646,610
Chilled Water Supply Installation at Royal Preston Hospital Day Case PlantroomConstructionThe James Mercer Group Ltd
$65,000
Water Bylaws Upgrade at John Anderson Building, University of StrathclydeConstructionTaylor & Fraser Limited
$101,252
Chilled Water Pipework Replacement at University of DerbyConstructionArc Mechanical and Electrical Ltd
$47,531
Chiller Replacement and Cooling System Upgrade for London Centre of NanotechnologyConstructionMeridian Cooling ltd
$369,700
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month
Revenue from government work£312K won so far





