Design, Supply, and Installation of 40lm Watermain Diversion at EARPS Site for Tideway East
CVB Joint Venture · Awarded contract
AwardedDesign, Supply, and Installation of 40lm Watermain Diversion at EARPS Site for Tideway East
Awarded 13 Aug 2022
Awarded13 Aug 2022
Value£66,000.00
SupplierN/A
AgencyCVB Joint Venture
RegionSouth East
CategoryWater & Sanitation
Ended 4y 3mo ago7d term
Awarded 13 Aug 2022Expired 20 Aug 2022
About
CVB Joint Venture awarded a contract to N/A for the design, supply, and installation of 40 linear metres of water main at the EARPS site as part of the Tideway East project.
The works were carried out in two separate visits, and the subcontractor was required to have experience completing Thames Water designs for approval.
The contract value was £66,000.
Similar open tenders12
TenderCloses
Design and Construction of Horse Fen & Somerton South Pumping Stations and Somerton Culvert – Upper Thurne Package 3Water & Sanitation
19 Jan 2027
Gunn Road Cold Water Mains Upgrade 2026 – DartfordWater & Sanitation
10 Nov 2026
Design & Integration Partner for 'Only Rainwater into Windermere' (ORiW) Programme – Windermere Water Quality InfrastructureWater & Sanitation
30 Nov 2026
Remediation of Foul and Surface Water Drainage at Three Elms Trading Estate, HerefordWater & Sanitation
11 Nov 2026
Maintenance and Improvement of Public Rights of Way (Bridleways & Footpaths) and Watercourses 2027–2030Infrastructure
25 Nov 2026
United Utilities Rainwater Management Framework – Appoint Five Partners for Design & Build and Build Only (12 to 18 months)Water & Sanitation
16 Nov 2026
Design and Build Refurbishment of Seven Public Conveniences – West Oxfordshire District CouncilConstruction
25 Nov 2026
Construction of 1.75ha Currynierin Community Park with Inclusive Play Facility – Waterside, Derry/LondonderryConstruction
04 Dec 2026
NWL Framework for Low-Complexity MEICA Works on Water and Wastewater AssetsWater & Sanitation
25 Nov 2026
Drainage Remediation of Foul and Surface Water at Three Elms Trading Estate, HerefordWater & Sanitation
11 Nov 2026
Supply of Polyethylene (PE) Pipes and Fittings – Scottish Water Framework AgreementWater & Sanitation
14 Nov 2026
Supply of On-Water Clothing and Equipment for UK Ministry of Defence – 5‑Year Framework (£30m–£74m)Defense & Aerospace
02 Feb 2027
Other similar contracts12
Contract and supplierAwarded value
Thames Tideway Tunnel C405 Main Works West – Acton Storm Tanks Syphon Main DiversionInfrastructureN/A
$548,000
Sewer Diversion Design Review for Colville Estate Phase 2CWater & SanitationThames Water
$20,000
Sewer Diversion Design for Colville Estate Phase 2C, N1Water & SanitationThames Water
$56,747
Sewer Diversion Tunnelling Design & Construction for HS2 MWCC NorthWater & SanitationTerra Solutions
$2,099,850
Water Main Diversion Construction at Moor BridgeWater & SanitationSevern Trent Water Ltd
$31,062.52
Water and Sewer Diversion for Colesdown Hill Underbridge SchemeWater & SanitationSouth West Water
$584,413
Water Main Diversion for Bridge Construction by East Riding of Yorkshire CouncilWater & SanitationYorkshire Water Services Ltd
$21,191.26
Water Main Diversion at Thane Road, Nottingham Phase 2Water & SanitationSevern Trent Water Ltd
$318,704.67
Rising Main Ducting Works for Thames Tideway Tunnel - C405 Main Works WestInfrastructureN/A
$419,676
Sewer Diversion Works for Colville Estate Phase 2A&B Regeneration by Thames WaterWater & SanitationThames Water
$493,648.6
Slipform Equipment and Timber Packers for Thames Tideway Tunnel C405 Main Works WestInfrastructureN/A
$608,000
Formwork, Rebar and Concrete Works at Tideway East EARPS SiteConstructionKelly formwork UK Ltd
$2,200,000
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open water and sanitation tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month
Revenue from government work£312K won so far