Concept Design for Restoration of Allander Water and Luggie Water
East Dunbartonshire Council · Awarded contract
AwardedConcept Design for Restoration of Allander Water and Luggie Water
Awarded Unknown
AwardedNot specified
Value£139,970.00
SupplierStantec UK Limited
RegionScotland
CategoryConsultancy & Legal
About
East Dunbartonshire Council awarded a contract to Stantec UK Limited for concept design (RIBA Stage 2) for the restoration of physical, ecological, and community attributes along the Allander Water in Milngavie and the Luggie Water & Park/Stand Burn in Kirkintilloch.
The contract value is £139,970.
Similar open tenders12
TenderCloses
Design Team Services for North Lochs Community Hall Redevelopment, LeurbostConstruction
18 Dec 2026
Construction of 1.75ha Currynierin Community Park with Inclusive Play Facility – Waterside, Derry/LondonderryConstruction
04 Dec 2026
Flooding and Drainage Engineering Services Framework – Falkirk Council (2027–2031)Water & Sanitation
30 Nov 2026
Douglas Valley Outdoor Recreation Market Research, Branding, Website & Wayfinding – South Lanarkshire CouncilConsultancy & Legal
15 Dec 2026
Independent Evaluation of Lost Peatlands Connections Habitat Restoration Project – Neath Port Talbot & Rhondda Cynon TafConsultancy & Legal
25 Nov 2026
Framework Agreement for Drainage Civil Engineering Works – East Dunbartonshire CouncilWater & Sanitation
11 Dec 2026
Design and Construction of Strabane Leisure Centre and Road Realignment — Preliminary Market EngagementConstruction
27 Nov 2026
Design & Integration Partner for 'Only Rainwater into Windermere' (ORiW) Programme – Windermere Water Quality InfrastructureWater & Sanitation
30 Nov 2026
RSPB Design of Erosion Protection and Vegetation Restoration for Inland Loch IslandsEnergy & Environment
01 Dec 2026
Design and Build 34m Replacement Footbridge over South Tyne River – Dryburn (near Garrigill, Alston Parish)Infrastructure
07 Jan 2027
Design and Build Refurbishment of Hayling Road Play Area, South Oxhey (Budget £135,500)Construction
07 Dec 2026
Floodplain Reconnection, Weir Modification and High-Risk Water Quality Outfall Outline Designs — Blackdown Hills Green Finance AcceleratorEnergy & Environment
30 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Restoration Plan for River Lugg SSSIEnergy & EnvironmentAECOM Infrastructure and Environment UK Limited
$30,287
RIBA 2 Concept Design for Candren Burn RestorationConsultancy & LegalEnviroCentre Limited
$124,590
Design and Construction of Waterside Play Area in KirkintillochConstructionWicksteed Leisure Ltd
$149,938
Project Brief and Concept Design for Lasswade & Dalmore Weirs on River North EskWater & SanitationJeremy Benn Associates Limited
$124,377
Concept Design for Restoration of Burdiehouse Burn and Surrounding LandscapesEnergy & Environmentcbec eco-engineering UK
$0
Design and Installation of Play Area at Luggie Park, KirkintillochConstructionKOMPAN Limited
$110,935.48
Feasibility and Concept Design for Dargavel Burn Restoration and Weir RemovalConsultancy & LegalFairhurst
$0
Consultancy Services for Lochshore Development Masterplan and Landscape DesignConsultancy & LegalSLR Consulting Limited
$55,049
Design of River Restoration for the Sanctuary Project in StranraerEnergy & EnvironmentIronside Farrar
$196,112.5
Design Services for Balgray Reservoir Boardwalk Community Design ProjectInfrastructureErz Ltd
$71,080
Construction of 4km Walkway and Landscaping at Lochshore, North AyrshireConstructionJohn McGeady Ltd
$971,360
Design Team Contract for Aurs Road Upgrade and Balgray Reservoir WorksInfrastructureStantec UK Limited
$292,756.73
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open consultancy and legal tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month
Revenue from government work£312K won so far





