Asbestos Abatement Works
Awarded 06 Nov 2026
About
SCOPE OF WORKS • The client is to provide a crash deck below the ceiling above the main stairwell with an access tower into the loft hatch with a platform to safely lower waste from the loft.
• This will ensure of no risk to the other building users being struck with debris on the floors below and removes the fall risks over the stairwell.
• The erection a sheeted exclusion zone at the entrance to the works area with an area to primary decontaminate • The use of oxford matting and lightweight Youngman walk board boards with handrails where applicable.
• The controlled removal and disposal none asbestos MMMF loft insulation throughout the loft space (approx 500m2 areas are 4 layers thick) of the Clinical Practice centre the removal of all associated rubble on the back of the fixed ceiling followed a clean of the work area.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.