Alternative Active Effluent Discharge Line Installation Works and Final Design
Awarded 18 Oct 2026
About
The Cooling water system at NRS Hunterston B site is no longer required for any cooling function.
Therefore, the intention is to remove the Cooling Water pumps and there is a requirement to provide Alternative Active Effluent Discharge Lines (AAEDL) to the sea discharge point.
This contract is for final concept design services and the marine installation of new pipe, valve and other minor works for the AAEDL seaward side, at the Hunterston B Nuclear site.
This is to include: - End of line isolation and backflow protection - Culvert fixings - Pipe fitting and valve repair/replacement/installation - Pressure testing and maintenance strategy - Any required pre-works The Contract has been awarded via Mini-Competition under the NRS Decommissioning and Asbestos Removal (DAR) Framework Lot 1 - conventional deplanting, asbestos removal and demolition.
Similar open tenders12
Other similar contracts12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.